EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
VelocityXLRG
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (263)
Research
- (2)
Purchase Kit
- (1)
Workshop
- (7)
Misc. Parts
- (1)
Fuselage
- (81)
Firewall
- (1)
Canard
- (31)
-
Canard Wing Tips,...
-
Canard Wing Tips,...
-
Glassed Spots on Canard
-
Reset Elevator Hinges
-
Reset Elevator
-
Canard & Elevators
-
Canard & Wings
-
Door Gas Struts
-
Doghouse, Nose Gear...
-
Doghouse
-
Doghouse
-
Sanding and micro work
-
Glass work on canard
-
Glass work on canard
-
Re-center Canard on...
-
Re-center Canard on...
-
Re-center Canard on...
-
Re-center Canard on...
-
Canard flanges
-
Canard flanges
-
Flange
-
Flange
-
Doghouse
-
Fit Doghouse
-
Sanding Canard and...
-
Micro and Sanding
-
Micro and Sanding
-
Prepare Canard and...
-
Prepare Canard and...
-
Prepare Canard and...
-
Prepare Canard and...
Wings
- (25)
Controls
- (10)
Nose Gear
- (14)
Main Gear
- (21)
Avionics
Lighting
Instrument Panel
- (1)
Engine
Propeller
Fuel System
- (62)
Interior Finish
Paint / Decals
- (5)
Inspection
Tools
Auto Entry
- (1)
Builder Name:
Patrick Mayworm
-
Project:
Velocity - XL/RG
-
VIEW REPORTS
Total Hours:
1417
Total Flight Time:
Start/Last Date:
Jul 28, 2001 - No Finish Date
Engine:
Continental IO 550N
Propeller:
Catto
Panel:
Garmin
Friendly URL:
https://eaabuilderslog.org?s=VelocityXLRG
Home or Last Project Picture
May 01, 2020
Flange
- (6 hours)
Category: Canard
Cleaned the sump tank and temporarily installed it in the fuselage. Drilled bolt holes and hole in the bottom of the fuselage to enable draining. Glassed the front flanges for the canard with 6 layers of Triax.
IMG_8440.jpg
IMG_2562.jpg
IMG_2563.jpg
IMG_2564.jpg
IMG_2566.jpg
IMG_8441.jpg
IMG_8437.jpg
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.